{"id":7012,"date":"2021-04-01T12:49:22","date_gmt":"2021-04-01T09:49:22","guid":{"rendered":"https:\/\/ukrndiv.com.ua\/en\/?page_id=7012"},"modified":"2021-04-01T12:49:22","modified_gmt":"2021-04-01T09:49:22","slug":"the-list-of-organizational-and-methodological-documents-os-pv-dp-ukrndiv","status":"publish","type":"page","link":"https:\/\/ukrndiv.com.ua\/en\/the-list-of-organizational-and-methodological-documents-os-pv-dp-ukrndiv\/","title":{"rendered":"The list of organizational and methodological documents OS PV DP \u201cUkrNDIV\u201d"},"content":{"rendered":"<p><strong><u>PROCEDURES<\/u><\/strong><\/p>\n<p>PS 9.01 Procedure for personnel selection and preparation for the certification body<\/p>\n<p>PS 9.02 Provisions for the procedure for the personnel assessment of the certification body<\/p>\n<p>PS 9.03 Procedure for cooperation of the certification body with subcontractor during certification works<\/p>\n<p>PS 9.04 Procedure for certification works valuation and contractual documents paperwork of the certification body<\/p>\n<p>PS 9.05 Procedure for preparation of the certification body\u2019s documents<\/p>\n<p>PS 9.06 Procedure for certification of the railway rolling stock products<\/p>\n<p>PS 9.07 Procedure for decision-making on the application of product certification<\/p>\n<p>PS 9.08 Procedure for sampling and identification of the test specimens<\/p>\n<p>PS 9.09 Procedure for specimens handling which are used during the products conformity assessment be the certification body<\/p>\n<p>PS 9.10 Procedure for the production inspection during the certification of products<\/p>\n<p>PS 9.11 Procedure for approval of the manufacture<\/p>\n<p>PS 9.12 Procedure for the quality management system assessment of the manufacturing enterprise<\/p>\n<p>PS 9.13 Procedure for recognizing the results of certification<\/p>\n<p>PS 9.14 Procedure for accepting the decision on certification, issue and cancellation of documents on certification and control of their use<\/p>\n<p>PS 9.15 Procedure for performing a technical supervision of certified products manufacture and approved manufacture<\/p>\n<p><a href=\"https:\/\/ukrndiv.com.ua\/wp-content\/uploads\/2021\/04\/PS-9.16-Poryadok-rozglyadannya-apelyatsij-skarg-i-spirnyh-pytan-OS-PV-DP-UkrNDIV-11.pdf\">PS 9.16 Procedure for considering appeals, claims and controversial issues of OS PV DP &#8220;UkrNDIV&#8221;<\/a><\/p>\n<p><a href=\"https:\/\/ukrndiv.com.ua\/wp-content\/uploads\/2021\/04\/PS-9.261.pdf\">PS 9.26 Procedure for application of licenses, certificates, attestations and marks permitted by OS PV DP &#8220;UkrNDIV&#8221;<\/a><\/p>\n<p>PS 9.27 Procedure for certification of services of technical maintenance, repair and renewal of railway, tram locomotives and rolling stock<\/p>\n<p>PS 9.28 Procedure for conformity assessment of products to the requirements of Technical regulations<\/p>\n<p>PS 9.29 Procedure for use of the conformity assessment modules<\/p>\n<p>PS 9.30 Procedure for type check performance<\/p>\n<p>PS 9.31 Procedure for assessment of the complete quality assurance<\/p>\n<p>PS 9.32 Procedure for declaring and declarations records<\/p>\n<p>P.S. 33 Procedure for determining impartiality risks<\/p>\n<p>PS 9.35 Procedure for application of modules for procedures of conformity assessment, compatibility, suitability for use, verification of subsystems of infrastructure elements and rolling stock of the railway transport<\/p>\n<p>PS 9.36 Procedure for assessing the conformity of car-building products to the requirements of the Technical Regulations for Mobile Pressure Equipment<\/p>\n<p>METHODOLOGIES, ORDER<\/p>\n<p>MS 9.18 Control of documents. Methodology of the quality management system of the certification body<\/p>\n<p>MS 9.19 Control of protocols. Methodology of the quality management system of the certification body<\/p>\n<p>MS 9.20 Control of inappropriate service. Methodology of the quality management system of the certification body<\/p>\n<p>MS 9.21 Internal audit. Methodology of the quality management system of the certification body<\/p>\n<p>MS 9.22 Corrective and preventive actions. Methodology of the quality management system of the certification body<\/p>\n<p>NIA 9.23 Order on the quality of the body of certification of car-building products of the State Enterprise &#8220;UKRAINIAN SCIENTIFIC RAILWAY CAR BUILDING INSTITUTE (OS PV DP &#8220;UkrNDIV&#8221;)<\/p>\n<p>MS 9.24 Explanation of the OS PV DP \u00abUkrNDIV\u00bb on the use of supplier documents during certification. Methodology of the quality management system of the certification body<\/p>\n<p>MS 9.34 Methodology for identifying risks associated with activities of the certification body\u00a0 of car-building products, their assessment and determination of the form of their management<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PROCEDURES PS 9.01 Procedure for personnel selection and preparation for the certification body PS 9.02 Provisions for the procedure for the personnel assessment of the certification body PS 9.03 Procedure for cooperation of the certification body with subcontractor during certification works PS 9.04 Procedure for certification works valuation and contractual documents paperwork of the certification [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-7012","page","type-page","status-publish","hentry","post"],"_links":{"self":[{"href":"https:\/\/ukrndiv.com.ua\/en\/wp-json\/wp\/v2\/pages\/7012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ukrndiv.com.ua\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ukrndiv.com.ua\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ukrndiv.com.ua\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/ukrndiv.com.ua\/en\/wp-json\/wp\/v2\/comments?post=7012"}],"version-history":[{"count":1,"href":"https:\/\/ukrndiv.com.ua\/en\/wp-json\/wp\/v2\/pages\/7012\/revisions"}],"predecessor-version":[{"id":7015,"href":"https:\/\/ukrndiv.com.ua\/en\/wp-json\/wp\/v2\/pages\/7012\/revisions\/7015"}],"wp:attachment":[{"href":"https:\/\/ukrndiv.com.ua\/en\/wp-json\/wp\/v2\/media?parent=7012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}